FryAVSI training
Charts, Examples and Field Worksheets
Find a specific example, copy its direct link or print a lesson for a practice session.
Take a worksheet to your next planning session
Free downloads with a blank worksheet and a completed practice example. Open the HTML file in your browser to read or print it; CSV files open in a spreadsheet. No sign-up is required.
Camera and door planning
Required views, schedules, permissions and evidence.
Network rule lab
Interpret a rule match, plan a correction and retest.
Network assessment
Locations, device types, applications and acceptance checks.
Dispatch and closeout
An onsite task brief, test record and owned follow-up.
Open the example you need
The office connection map
Explain router, switch and AP roles.
Open this example →IP settings card
Read an address, prefix, gateway and DNS setting.
Open this example →PoE budget example
Compare device allocations with available watts.
Open this example →Warehouse and office Wi-Fi example
Plan around walls, stock racks and busy rooms.
Open this example →Wi-Fi support-note builder
Record comparisons and prepare a support request.
Open this example →Fiber identity checklist
Identify the cable, connectors and optics.
Open this example →Repair decision chart
Understand what can lead to repair or replacement.
Open this example →Annotated cable test record
See what a wiremap PASS does and does not establish.
Open this example →T568B pair and pin diagram
Keep electrical pin assignment separate from jack slot order.
Open this example →/26 subnet chart
Work the address range and available hosts.
Open this example →OSI checks and port chart
Choose checks for the required application.
Open this example →Fiber loss-budget example
Calculate an allowance with explicit assumptions.
Open this example →Two-building comparison
Compare the route and operating requirements.
Open this example →Fiber lab record
Connect preparation, measurement and review.
Open this example →Small-office access matrix
Specify allowed and blocked behavior.
Open this example →Security policy, camera and door reference tools
One-page security policy outline
Write a rule with an owner, exception process and evidence.
Open this example →Digital and physical offboarding checklist
Check identity, remote tools, badges and cached access.
Open this example →Policy-to-control matrix
Connect each rule to an enforcement point and test.
Open this example →Security access matrix
Define allowed and denied paths before writing rules.
Open this example →MSP security review card
Review device coverage, exceptions, alerts and recovery.
Open this example →Incident decision log
Capture observations, authority, impact and evidence.
Open this example →Camera-purpose chart
Specify what a view must show under actual conditions.
Open this example →Door permission matrix
Define areas, schedules and credential lifecycle.
Open this example →Video permission outline
Separate viewing, export and administrator authority.
Open this example →Camera storage calculation
Estimate continuous-recording payload with explicit assumptions.
Open this example →Door acceptance checklist
Plan approved tests and retain their evidence.
Open this example →Physical-security review card
Review usable recording, access, time and operating dependencies.
Open this example →Reference a FryAVSI example
Each lesson section has a direct link and a copy-link control. Use the section link when citing a particular chart or example, and include the title, FryAVSI, and the displayed revision date.
FryAVSI. “Fiber Loss: Calculate, Measure, Explain,” loss-budget example. Updated September 10, 2026. Open the cited example.
Worked numbers and fictional sites are teaching examples. A measured field result must identify its actual setup and conditions. Follow the linked original sources when you need the underlying product or standards guidance.
FryAVSI · Northeast Ohio and beyond
Turn the learning into a working result.
Share your site, the challenge and the result you need. Our team can help plan or carry out the work.
